Project · Rail Tunnel

USBRLCommunication Across 119 km of Tunnels

Jammu & Kashmir · Northern Railway

A VHF tunnel communication system designed to provide coverage across 65 tunnels on the 119 km tunnel section of the USBRL project.

Udhampur–Srinagar–Baramulla Rail Link, Jammu & Kashmir · Northern Railway
Rail Tunnel
272 km
Section Length
119 km
Total Tunnel Length
65
Number of Tunnels
13 km
Longest Tunnel
Project Overview

Declared a “National Project”

  • Declared as a “National Project”
  • Total section length of 272 km
  • Total tunnel length — 119 km
  • Number of tunnels — 65
  • Longest tunnel length — 13 km
  • OMU — 100 nos; ORU — 400 nos
Explore our engineering services
The Challenge

Maintaining reliable communication in terrain where conventional signal penetration is impossible.

Mountain Terrain

The tunnel is positioned within the mountain terrain, making signal penetration impossible.

Avalanche-Prone

Avalanche-prone area.

Rough Weather

Rough weather.

Heavy Snow

Heavy snow and avalanche.

Our Solution

Reliable communication where conventional coverage cannot reach.

VHF
  1. Survey
  2. Design
  3. Supply
  4. Installation
  5. Integration & Commissioning

Planning a mission-critical deployment?

Talk to our team about wireless coverage for tunnels, metros, airports and mission-critical environments.